Why design & build works better than traditional contracting

0

Share

Design & Build (D&B) offers several key advantages making the process faster, more efficient, and highly collaborative for all parties involved. 

Having delivered projects under both D&B and traditional contracting models, North 51 Consulting recognises that successful outcomes in either approach rely on clear oversight, disciplined coordination and effective control of cost, quality and change. When these fundamentals are well managed, risk is reduced, and projects are better positioned to achieve their intended design, program, and budget objectives.

Single Point of Responsibility

In D&B, a single entity is responsible for both design and construction eliminating the typical friction that can rise between designers and contractors under traditional contracting methods. 

When opting for the D&B  form of contract, several key criteria are fundamental ensuring that the contract structure and procurement approach align with the client’s objectives and project requirements.

The D&B model integrates both design and construction responsibilities under a single contractor and therefore offers advantages over traditional contracting, depending on the nature and complexity of the project.

Project Scope

The employer’s requirements and clear definition of scope is quintessential. This includes a well-defined brief that sets out performance specifications, functional requirements, and quality standards, forming the foundation for effective delivery under a D&B arrangement.

The employer’s requirements form the basis of design and tender documentation. If they are unclear or insufficiently detailed, cost and quality control can be compromised, often resulting in project delays and cost overruns. 

Cost Certainty

D&B provides greater cost certainty early in the process as design and construction are often tendered as a single package. However, this certainty is directly linked to how accurately the employer’s requirements and finishes are defined at the outset. When properly established, value engineering opportunities can be integrated into the early design stages, rather than introduced later as reactive cost-saving measures.

Studies by the Design-Build Institute of America (DBIA) show that Design-Build projects are often delivered with lower cost growth than traditional methods of contracting. 

Overlapping Timelines and Project Phases 

D&B allows overlapping of design and construction phases, resulting in faster project completion compared to traditional contracting. This may be the deciding factor in F&B and commercial projects where earlier entry into operation enables quicker Return on Investment (ROI). Design & Build projects typically progress at a faster pace than traditional contracting because: 

• Design and construction phases can overlap (fast-tracking) 

• Collaborative decision making reduces delays in communication and the need for re-bidding, minimising downtime

This makes the D&B form of contracting ideal for projects with tight deadlines or those that continue to evolve after the concept design phase.

Design Responsibility and Accountability

Unlike traditional contracting, where the design responsibility rests solely with the client and the client’s appointed design team under D&B, the design responsibility shifts to the contractor. This provides the client with less control but increases accountability on the contractor’s side. The contractor manages design development, enabling faster site execution and project completion, as design and construction phases may overlap.

Risk Allocation and Management

The D&B model transfers significant design and construction risks to the contractor compared to traditional contracting. While the client’s exposure to cost overruns and design errors is minimised, the contractor may factor these risks into their bid. In the wider construction industry, providing more detailed designs during the early stages helps the contractor reduce unforeseen risks that may not be apparent at the project outset. However, the impact of this depends on the project type and the contractor’s pre-qualification.

Quality Assurance and Design Innovation

Whilst in traditional contracting, detailed designs are developed based on specified requirements, in the D&B form of contracting, the client must specify performance criteria rather than fully detailed designs, allowing the contractor to propose innovative solutions. The integration of design and construction encourages higher-quality outcomes, as the project team can optimise performance holistically from the outset whilst maintaining continuous quality control throughout both design and construction phases.

Legal and Contractual  Statute

From a legal and contractual statute, the chosen form (e.g. JCT Design & Build, NEC Option A/E) must align with client’s risk appetite and project’s complexity. Clear definitions of responsibilities, liabilities, warranties and intellectual property rights should be established at the outset by the project manager or employer’s agent. 

Improved Collaboration and Innovation

With the client, project manager, designers and contractor working as a single team from the outset, creativity and problem-solving is significantly enhanced.

• Early contractor involvement helps identify constructability issues early on in the project, thereby diffusing any potential showstoppers. 

Innovative materials, methods, and technologies are more easily and readily adopted than traditional contracting.

Reduced Claims and Change Orders

With a single contract covering both design and construction, there is less opportunity for scope gaps or conflicting interpretations of responsibility resulting in fewer legal disputes and a more streamlined, well-controlled change management system. 

Greater Employer/Client  Involvement 

The employer/client remains engaged in key decisions—particularly regarding finishes, aesthetics, and performance without having to manage multiple contracts or coordinate between design and construction teams, thus resulting in transparent communication and increased alignment with employers/clients end project vision. 

In summary, depending on the client’s risk appetite, TCQ (Time, Cost, Quality) parameters, whether the project is design-led  or specification/performance criteria-led, and the project type such as commercial, residential, F&B/hospitality, retail,  offices, or infrastructure, key project drivers are required to be established at the outset to determine the appropriate form of contract and develop the overall procurement strategy. Whilst the Design & Build Model offers a fast-track project completion compared to traditional contracting, in both instances the role of the design team, comprising of architects, structural designers, MEP designers, interior designers, project managers, cost consultants, and contract administrators, is vital. Additionally, contractor pre-qualification and experience with the chosen contract type and form ie. D&B or traditional contracting is essential to ensure the project’s overall success.

Leave a Reply

Your email address will not be published. Required fields are marked *

You can't keep playing like that - Final Score pundits on 'fragile Saints

Subscribe our newsletter and stay up to date with the latest headlines, breaking news, and key industry insights.

By pressing the subscribe button, you confirm that you have are agreeing to our Privacy Policy and Cookie Statement.

Follow Us